Sample report (example case, illustrative values)

SAG32ft (example case), 32 ft SAG mill, 1 m slice of the mill

Case

65.2 sSimulated time
10.16 rpmMill speed
5.91 sOne revolution
14,052Particles
61.6 tCharge mass
1,074 kWPower draw, latest

Mill and ore

9.75 mMill diameter
1.00 mMill length
10.16 rpmSpeed
37.5Ore Axb
15.0 kWh/tBond work index
Gear and pinionDrive

Charge size distribution (by mass, at the start of the run)

025507510022.12.22.32.4log10 of the size in mmPassing [%]
MediaOre

Media Ore · each class is one size, drawn as a straight step between its diameter and the next.

Particle types in the charge
ShapeDiameter [mm]MaterialCount
SPHERE250.0OreWet172
SPHERE150.0OreWet1,595
SPHERE133.0SteelWet2,145
SPHERE102.0SteelWet4,756
SPHERE100.0OreWet5,384

Key findings

Power draw

Averaging window02505007501,0001,250010203040506070mill startsTime [s]Power [kW]

The shaded window is used for the average. It starts one revolution after the mill starts turning.

Torque-arm power, a second measure: the weight of the mill contents (61.56 t) times the horizontal offset of their centre of gravity from the axis, times the mill speed, over 10 frames of the last revolution: 1143.0 kW, 1.03 of the DEM power. The DEM power is the energy the contacts dissipate; the torque arm is the work to hold the charge lifted, as in the published mill power models.

Power split

Latest values from HeartBeat.txt, cumulative over the energy averaging window of the run.

Throughput

1092 t/h (baseline estimate)Throughput
1092 t/hBaseline estimate
4.0 mmDischarge P80
1.06 mmDischarge P50
6615 kWGross mill power
6.06 kWh/tMill energy per tonne

Mill power

kW
DEM power of the dry charge (scaled to the real length)5049
Slurry, net: +25.5 % charge mass, -5.5 % friction and damping+943
Mill running with no load623
Gross power (motor output)6615

Slurry in the mill: 117.0 t, slurry filling the voids of the tumbling charge (voidage 0.53); grinding media and ore of the DEM charge 281.3 t.

The DEM charge is dry. The slurry fills 100 % of the charge voids at 1.83 t/m3 and adds mass. The slurry also takes friction and damping out of the charge, 5.5 % of the power in a plant ball mill survey (the draw running and after grind-out). The no-load power is Morrell's equation for a gear and pinion drive at 75 % of critical speed.

Discharge size distribution

0255075100-2-1012log10 of the size in mm (0 is 1 mm, 1 is 10 mm, 2 is 100 mm)Passing [%]

No plant throughput was given, the throughput is the baseline estimate. Enter a measured plant throughput in the Throughput window (Mill Configuration, Throughput button) to get a throughput factor for this mill.

Ore in the DEM charge

Size [mm]ParticlesMass [t]Normal energy [kW]Shear energy [kW]Energy used [kWh/t/h]
25017218.33128.5206.57.01
150159536.71430.1622.311.71
100538436.72595.5807.116.22

Grate discharge

Slurry through the grate at the throughput851 m3/h at 1.83 t/m3

The SPH run has the real grate, fed by a thin slice of the mill, starts with the discharge chambers filled and runs for about two revolutions. The first revolution flushes the filled chambers; the capacity is the mean slurry discharge over the complete revolutions after it (counted from the start of the discharge), times the slurry density and the pulp solids, reduced by the blinded share of the open area.

Fines: the ore finer than the DEM ore keeps the energy of the finest DEM ore and also takes the ball-ball collision power, 607 kW (607 kW with the energy scale), shared by mass and by Austin's size dependence (alpha 1, Lambda 2.5), peaking at the feed size each ball is sized for by Bond's ball size equation (133 mm balls 42 mm, 102 mm balls 25 mm).

Ore: A 75 %, b 0.5, t-family alpha 0.8, grate 25 mm; energy scale 1 and breakage cycle 40 s are baseline constants of the model; the grate classifies the discharge as in the JK SAG model, ore below 1 mm leaving with the water; the discharge rate is solved from the throughput (40 1/h). Energy window 17.72 to 64.96 s. The baseline was set on two plant SAG mills and a plant ball mill survey, see the user guide.

Charge motion

Mid-plane slice viewed along the mill axis at the start of the motion and at the end of each revolution. Colours use the same range in every image. Click an image to enlarge.

Motion start

frame 122, t = 6.10 s (-0.02 s from the revolution end) · toe -75°, shoulder 75°

Revolution 1

frame 240, t = 12.00 s (-0.02 s from the revolution end) · toe -35°, shoulder 145°

Revolution 2

frame 359, t = 17.95 s (+0.02 s from the revolution end) · toe -35°, shoulder 140°

Charge shape

-100-5005010015000.511.52Snapshot (0 = motion start, then revolutions)Angle from mill bottom [deg]
Toe angleShoulder angleCentre of gravity angle

Toe and shoulder are the ends of the arc where the charge touches the shell, found from the particles within 1.5 largest diameters of the shell in the mid-plane slice. A stable charge gives flat lines.

Liner wear and pressure

QuantityValueUnit
Total liner wear0.0025%
Total liner wear0.00062mm
Wear rate0.9mm/day
Most worn triangle0.032%
Average contact pressure (latest revolution)3.48e+08Pa
Average contact force (latest revolution)27,232N
Highest pressure in any cell (latest revolution)9.65e+08Pa
Highest wear in any cell19.6J
Peak pressure cellradius 5.20 m, 352° from the bottom
Peak wear cellradius 5.30 m, 14° from the bottom

The pressure and force values reset every revolution (WorldTriangleForcePeak's ResetFreq), so they show the latest completed revolution's own peak and average, not a running worst-case since the start of the run: a single explicit-integration step spike early in a long run no longer inflates these numbers for every revolution after it. Total liner wear and wear rate are still a running total, since a meaningful wear rate needs the whole run. Wear shown as real life (run speed-up 1 x, wear window 0.000683 days).

Liner wear against scans

Real liner scans of a full-scale SAG mill (not the example case above), shown to illustrate the wear workflow: dots are the measured crest height lost along the mill axis at 64, 90 and 102 days, solid lines are the learned wear law fitted to the scans, and the dashed line is its forecast for 120 days.

Crest height lost along the mill axis: scans at 64, 90 and 102 days, learned wear law, 120 day forecast

Liner parts

Per revolution of steady motion, 8.0 revolutions from 17.72 to 64.96 s. Impact energy is the normal energy the particles dissipate on the liner; wear is the Archard wear depth in real life (um per revolution of the mill, the run speed-up divided out), use it to compare cases rather than as a liner life. Wear shown as real life (run speed-up 1 x, wear window 0.000683 days).

PartArea [m2]Impact energy [kJ/rev]Share [%]Wear mean [um/rev]Wear p95Wear max
Lifters48 rows, 249 mm above the plate36.08391.34810.1020.4171.71
Shell plate30.6191.00190.01080.04350.149
0100200300400500LiftersImpact energy: 391391Shell plateImpact energy: 9191Impact energy per revolution [kJ]

Where the plate is hit between the bars

Plate values across one pitch of the lifters (638 mm), averaged over the 48 pitches. Shaded bands are the bars.

lifterlifter00.10.20.30.40.50200400600Impact energyposition on the plate from the lifter, in the direction of rotation [mm]Plate impact energy [kJ per pitch per rev]lifterlifter00.0060.0120.0180.0250200400600Wearposition on the plate from the lifter, in the direction of rotation [mm]Plate wear mean [um/rev]